Sewing Machine: My Thread order arrived which is awesome and i finally don't have any excuses to not sit down at the machine. The 1152 is finally finished and has already been put into action which ill cover a little later. The table tops of each machine have been swapped over. So i basically the 1152 was the easy one to finish. Seeing as the frame that came with the 1152 was sad in places it meant i had to full strip the frame and repaint it.
![](https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEjKYs6Vr3M6OApYrDi38r2rXQESliTiU7nh-F6oK0YzUoJzqk2AhoL88_mh0OR3VPaHb83zosdIEdbhrFAQu1j6f0rAQqxPFsPkDBd09LXZePXlRUWtJDZLFUXPe_b7gyyXqlcO_YkIn5Np/s1600/2014-08-20+21.19.53.jpg)
The now 515 unit is not 100%. The sewing machine is not right and hopefully with pre-wound bobbins it will improve the performance of the machine and eliminate another potential problem. Along with machine head issues i still have to attach the frame to the tabletop which wont be a problem once i find the time to do it.
Tank straps: I finally got off the start mark on one of my other projects. I have made the prototype tank strap which i am fairly happy with considering its my first time at the Juki-1152. I have had a few issues with the thickness of the tape however after a few shots some of the issues have been ironed out. The plan for these straps is to make 20 of them and sell them to various people. If i manage to sell all of them i will make some more however i don't sell any i wont be to phased.